Go to content

Installation - COMPACT GATE®

Skip menu
Skip menu
Features > Installation

4 SIMPLE STEPS
Laying a COMPACT GATE® is extremely easy and time-saving.
Always use the installation diagrams enclosed with the order confirmation, provided by our technical/commercial departments.
Measurements and indicative indications


Make an excavation
Excavation and water drainage
da un'impresa edile da 38 a 58 cm escluso soletta in cemento (circa 15 cm) in bolla.

Positioning
The construction company can position
the COMPACT GATE® gate by means of special lifting hooks and adjust the levels by means of special adjusting screws.

Fixing on the ground.
The construction company will carry out the concrete filling up to floor level, approximately 15 cm all around.

Electrical connection.
The COMPACT GATE® gate is already tested
and calibrated, simply connect your
electrical socket from your building to the gate.
The gate is already equipped with a schuko plug.
2025 - P.IVA 00554520262 - REA N. TV - 126909 del 11-07-77
COMPACT GATE®
Via B.Croce,19
31058 Susegana, Z.I. Bardini
Treviso (Italy)
T. +39 0438460161
HOME
FIRMA
KONTAKTE
GATE
PATENTS

KATALOG
GALERIE
FAQ
LANGUAGE
Copyright 2025- Patent-protected products
Privacy policy - Cookie policy
Uffici e Produzione
Via B.Croce 19 , 31058 Susegana
(Z.I. Bardini) - Treviso - Italia
Back to content